Workover rig operations pdf. It also outlines common downhole tools, safety requirements like firefighting and general precautions during rig-up and rig-down. Workover rigs have a surface depth that is equipped with diesel engines and transmissions and is available from 8000 ft to 30000 ft. It discusses the roles of civil engineers in workover operations such as clearing land, building foundations, and utilities. This rig for working over a well has a double blowout stack so it can continue to be produced while the workover is in progress. txt) or view presentation slides online. The forms are designed to be used by rig workers to document the inspection of tools and equipment commonly found on rotary and workover rigs. During last 5 years, there have MD MD been 80 80. As soon as the rig is released from the location, it has to be prepared for the move to a new location. We offer OEM support of Cabot™, Cardwell™, Cooper™, Franks™, Ideco™, Kremco™, National™, Skytop Brewster™, RMI™, and Wilson™ with certified service, repair, and replacement parts. Accuracy of content cannot be absolutely guaranteed. pdf from PE 341 at Indian Institute of Technology, Dhanbad. Workover planning is performed separately from the other operations on a stand-alone planning level. txt) or read online for free. sof providing workover services. This PetroKnowledge training course features the types of Completions, Work-overs and well preparation, Surface and Subsurface Well-bore Equipment and Procedures, barriers, work-over fluids, risk awareness and Organizing a Well Control Operation Workover Rigs FAQ Revised May 2011 Q – What is a workover rig? A – As defined in section 2449(c)(62), a workover rig is a mobile self-propelled rig used to perform one or more remedial operations, such as deepening, plugging back, pulling and resetting liners, on a producing oil or gas well to try to restore 79316956 Workover Operations - Free download as Powerpoint Presentation (. 23. Workover operations refer to a range of maintenance, repair, and remedial activities conducted to optimize or restore the productivity of a well. “Petroleum Production Engineering, Exploration”. It discusses types of non-flowing wells and well interventions that can be performed with coiled tubing units, wireline units, or using workover rigs. 1 GRID‐ELECTRICITY WORKOVER RIG The grid electricity workover rig can meet all kinds of workover operational requirements due to its safety, stability, and reliability as well as excellent technical performances. E. Workover rig drillout operations can be some of the most costly and important activities in the life cycle of a well. pdf - Free download as PDF File (. 1. Mar 26, 2014 · The article contains sections titled: 1. The workover rigs must service oil wells requesting maintenance as soon as possible. Buzarde. The most common are 1) killing a producing well and 2) controlling kicks, which occur during a workover. May 15, 2023 · Abstract. Anyone who needs to rely on any Particular subject in this manual is advised to verify it independently by contact your RIDE Inc. Hazards related to workover activities may include: Sand cleanout; Repairing liners and casing; Well Recompletions Sidetracking; Plug-back for oil & gas well drilling and servicing operations page 6 of 96 it is everybody‟s responsibility to ensure that theogdcl‟s hse management system is in place. Apr 2, 2024 · The primary well control is the kill fluid or mechanical plugging of the well. Responsibilities during rig supported completion and workover operations Well Control Prevention. Although the importance of well control during servicing work is recognized, accidents and incidents still occur. Also if there is a mechanical failure in the well, its production may drop, thus, in order to boost up the production from these offline wells, workover rigs are used. Well service personnel typically perform light interventions using slickline , wireline , or coiled tubing . When a well requires maintenance, its production is reduced or stopped for safety reasons and some workover rig must service it within a given Oct 27, 2015 · 6. Within the workover rig completion space, this has allowed for more in These conditions include the type of completion, formation pressures exposed to the wellbore, and the reasons for performing the workover. In a global first, Mubadala Petroleum in Thailand has successfully completed a three-month trial of a new technology designed to improve the operational performance of the regular program of well maintenance workovers required for its Gulf of Thailand fields. Cased hole b. In that, a fleet of heterogeneous rigs is hired to execute them. Course One. It is intended that the applicable requirements and recommendations of some sections of the Feb 1, 2020 · (1) Localization of conventional workover rigs has been achieved, and the resultant product is seen with mature tech- nologies and price advantage, and can fulfill demand of do- mestic operation. It then discusses different types of workover operations including measurements, maintenance, and workovers. It covers topics such as drilling practices, reservoir properties, rig equipment, drilling fluids, casing installation, cementing workover rigs, minimising the production loss associated with the wells waiting for maintenance service [3]. C. Drilling units/rigs are designed to move from one location to another location for undertaking drilling/workover operations after completing operations at an earlier location. g. The overall goal of the checklist is to assure that all employees working at Oil & Gas sites are provided a safe and healthy work Download Free PDF. Example Check lists details (PDF FILE) Workover Rig Maintenance (mp4) A complete Workover Rig Maintenance program for Excel. list of contents definitions guidelines guideline 01: pre-drilling works before rig mobilization guideline 02: personal protective equipment guideline 03: design guideline 04: operations workover rigs, minimising the production loss associated with the wells waiting for maintenance service [3]. 11. Conventional drilling rigs may do a better job in one situation than drilling with a hydraulic rig. org Ÿ Illustrate the major types and phases of well completion. If the rig does not have a mud box, pulling wet pipe can be messy, cold, and hazardous. We control and manage the hydraulic workover units, both onshore and offshore services. These properties are especially beneficial for offshore operations where space is limited and where weather conditions can be harsh. Workover activities include one or more of a variety of remedial operations on a producing well to try to increase production. More than 100 renowned technical experts contributed to the first major rewrite of the IADC Drilling Manual in 22 years. Apr 27, 2021 · Brown, J. However, in some cases, the rig pumps may not have sufficient capacity and pressure rating to perform the necessary operations. Transactions AIME “Well completions No. Field well-workover rules may be amended or canceled for cause at any time upon the initiative of the District Manager or upon the re-quest of a lessee. “Well Completions”. Saudi aramco - workover manual. It is necessary to check the amount of load for each casing job to make sure the derrick and substructure are strong enough to withstand these stresses. Daily Drilling Reports. In the deterministic approach, an integer linear programming model is used to determine the 3. Jul 9, 2017 · Figure 2. In 2002, a workover rig was modified to fit the need. Considering the number of Workover Rigs off contract and stacked it is now highly important that contractors have their equipment in ready to go on contract condition. Download Free PDF Saudi aramco - workover manual. 6 Well Servicing Operations Module Name: 2. INTRODUCTION. In many cases, workover implies the removal and replacement of the production tubing string after the well has been killed and a workover rig has been placed on location. 601 of this part, shall begin until the 19. The HWO unit performing workover operations in all operational aspects is a portable workover rig, and standard rig well control procedures are applied. Seek assurance that all personnel are competent to perform their assigned tasks and have the requisite well control training/certification. It involves clearing and leveling the land, constructing foundations and pads for equipment, installing utilities like bathrooms, building a waste pit lined with geotextile, fencing the area, and hardening the surface with sand and gravel layers to support heavy vehicles. 0 INTRODUCTION: About 80 on land workover rigs (60 The document discusses well completion and intervention workover operations. Well intervention for restoring or increasing production is a routine activity in any oilfield, however, it becomes an optimization opportunity for large fields with thousands of wells and high failure rate. Finally, it discusses the steps involved in a successful workover, including The concentric tubing workover rig has alleviated considerably the high cost of offshore well servicing; and dual, triple and quadruple conventional completions in upper zones can be dealt with economically. - The whole unit is compact and has a high working efficiency with a transmission Jan 11, 2013 · PDF | Purpose ‐ This paper aims to develop a practical method to evaluate operational performance of workover rigs and present an approach to measure | Find, read and cite all the research Aug 29, 2023 · In the vast and intricate world of the oil and gas industry, understanding specific equipment and processes can be daunting for many. Through the expanded collection of operation-specific data, operators and service companies alike can increase operational efficiency, improving both cost and predictability of a given operation. Routine C,R,& W operations often require the implementation of various well control procedures. Workover rigs are designed to handle various tasks, including: Drilling Operations & Well Completions. 3. In other situations, the opposite could be true. Once the economic life a well is over, the rate of production starts to decline. 1972. • Tankage – Workover rigs sometimes include tankage. net Workover Operations Manual - Free download as PDF File (. It discusses the types of workover rigs used, including details on 13 in-house rigs and 2 chartered rigs. Applications • Wells that require high buildup rates • Simple or complex 3D wellbore profiles Kupdf. The biggest problem with a bit float in workover is that the spring in the float is so strong that it makes the last 500 to 1,500 ft (150 to 500 m) of pipe pull wet. | Find, read and cite all the research May 23, 2023 · Conventional workover rigs are primarily hydraulic, not electric. It describes the purpose and key components of the hoisting system for raising and INTRODUCTION A workover rig is a portable rig that is used to perform workover operations in a well. Remote Operations services. This operations manual provides procedures for various well workover and testing operations such as: [1] Rig installation and movement, [2] Well killing using normal and reverse circulation, [3] Swabbing, [4] Squeezing cement, [5] Sand flushing, [6] Setting downhole tools. We present deterministic and stochastic programming models for the workover rig problem, one of the most challenging problems in the oil industry. They can be used for a wide range of maintenance and repair tasks, including replacing damaged tubing or casing, cleaning out wells, and re-perforating wells to increase productivity. 2. We design, build, and support the widest range of self-propelled and trailer-mounted well servicing, workover, and mobile drilling rigs in the world. Technical, field, service, support, and supervisory personnel desiring to gain an awareness of wellbore operations. Production Rig Equipment Mar 1, 2016 · When onshore oil wells reduce the production due to a malfunction, workover rigs are used to restore productivity. The document outlines the equipment, processes, and considerations for different rig workover methods including well killing, conventional workovers, concentric workovers, coiled tubing, snubbing units, fishing operations, and factors for selecting a workover rig. Thailand, Malaysia, Vietnam, Myanmar, Bangladesh, Brunei) and the United Kingdom. 5. Introduction 2. The term workover is used to refer to any kind of oil well intervention involving invasive techniques, such as wireline, coiled tubing or snubbing. 6 Well Servicing Operations Sub-Modules AIM Learning Topics Learning Objectives and Assessment Guidelines The instructor will impart knowledge on: The attendee will be able to: Wireline Operations A Types of Wireline Operations a. Well completion/well workover means those operations following the drilling of a well that are intended to establish or restore production. This document outlines the general procedure for workover operations, which typically involves: 1) Preparing the well by checking equipment and integrity, 2) Safely securing the well by isolating pressures, 3) Installing workover units after This chapter discusses the various methods of dealing with well control during completion and workover operations. Available now at IADC’s Techstreet store: Workover operations. (a) No well-workover operation ex-cept routine ones, as defined in §250. Refrigeration Unit-R Rig Lighting SCR Control Panels Transformers Welding Units-E Workover Rig Maintenance and Preventative Maintenance Scheduling Air Compressor Nov 12, 2018 · Abstract. A workover rig is a specialized drilling rig used in the oil and gas industry for performing workover operations on existing wells. ppt), PDF File (. In heavy interventions, the rig crew may stop production at the formation before making major equipment changes. Hydraulic workover and snubbing for well maintenance. Historical Background 2. over 580 workover jobs completed. Wikipedia, the go-to source for quick definitions, describes a workover rig in the following manner: “The term workover is used to refer to any oil well intervention involving invasive techniques, such as wireline, coiled tubing or snubbing. 1. Well Lifecycle Reporting & Analytics, Cloud-based SaaS software application for drilling, completions, workover and facility. healthy working conditions for personnel in drilling and well servicing operations. The following are the steps involved: Jun 6, 2014 · Rig Check was developed by the National Institute for Occupational Safety and Health (NIOSH) in partnership with safety experts from the oil and gas extraction industry. . Mar 18, 2019 · Workover operations with conventional workover rigs have an enormous impact on the site, adding strain to operational and production targets. “Production Operations Course I Well Completions” AIME Video- Tape Course. This process is used to restore production from a well that has decreased or stopped flowing, and it is an important part of the lifecycle of an oil or gas well. It discusses the basic components which include the rig engine, derrick/mast, derrick floor, hoisting system including draw works, catheads, hoisting tackle, rotary table, mud pump, and blowout prevention equipment. Historically, air is the most common gas for UBD; natural gas is the second most common. A significant proportion of these are accounted for by completion, workover, and intervention activities. 7 • Circulation Pumps – Use of the rig pumps for workover operations can eliminate the cost of units rented from service companies. The course teaches participants about well construction from drilling through completion and remedial workovers. Drilling Rig 2. API Recommended Practice 54, 4th Edition. Workover rigs contain a full line of drilling packages. EEST Energy offers hydraulic workover services meeting global requirements, especially in the Asia-Pacific region (e. Size and hoisting constraints for hydraulic rigs are reviewed. Production Operations. Ÿ Analyze the drilling and casing the pay zone. Given a set of wells needing maintenance and a set of workover rigs, the workover rig problem (WRP) consists of finding rig routes for minimizing the total production loss of the wells within a finite time horizon. Workover Rig is known as the Workover the different types of rigs include the offshore and onshore Rig that range from 150 horsepower to 1000 horsepower. Workover Rig Maintenance Download the Training Video. §250. The trial tested the use of an innovative modular Rigless Pulling Unit (RPU) in place of a conventional Hydraulic Workover Dec 20, 2006 · A conventional workover rig was the preferred approach to prepare the coiled-tubing candidate well when it required a changeout of production tubing or other workover activity. 2 GB7258, SY5202 as well as "3C" compulary standard. 2 Applicability These recommendations apply to rotary drilling rigs, well servicing rigs, and special services as they relate to operations on location. Learn more about well completion and workover activit Jan 1, 2014 · Plug and abandonment operations with conventional hydraulic workover units have an enormous impact on low-cost plug and abandonment campaign in Malaysia compared with conventional drilling rigs. D: “Application of Hydrauli c Workover Units to North Sea Operations”. representative. Workover Operations involves Involves well kill 82767392-Workover-Operations. RigReports improves Drilling, Completions, Workovers and Facility Reports. As an Operator, would it be helpful to have more timely This framework is used as a basis to analyse and enhance the performance of the work over rig including the improvement in rig efficiencies and reduction in operational costs. 6. When a well The document provides an overview of the components and equipment used on onshore workover rigs. It describes the steps in workover operations from well selection to rig down. Historias de Reacondicionamiento de Pozos de Compañías ECOPETROL y Hocol. L GB3836. The document also discusses well workover planning, selection of rigs for workovers, modular 1. [1] The document provides details about preparing a drill site for workover operations. The workover begins by removing the well head and possibly the flowline, then lifting the tubing head from the casing hanger thus beginning to pull out the tubing from the completion. Talk to an Expert 2. More specifically, a workover refers to the expensive process of pulling and replacing completion or production hardware in order to extend the life of the well. Find your optimal workover solution today. Scribd is the world's largest social reading and publishing site. The American Petroleum Institute has released the fourth edition of Recommended Practice 54 (RP 54), Occupational Safety and Health for Oil and Gas Well Drilling and Servicing Operations, which provides procedures for promoting and maintaining safe and healthy working conditions for personnel in drilling and well servicing operations. Scope 2. The framework is built on the collection and analysis of the overall equipment efficiency (OEE) established from the data gathered by the work over and production Oct 1, 2021 · However, differently from the DRSP, workover rig planning focuses on workover operations on the wells, usually considering single jobs representing interventions that are often unplanned and can be of much shorter duration than drilling operations. Halliburton Hydraulic Workover (HWO) units are the ideal well intervention solution for well maintenance, live well interventions, and re-entry operations. Uren, L. There are and for the post-LEP inspection dissemination of information to other rigs, branches, divisions, etc of the employer’s organization. BP EXPLORATION Guidelines for Drilling Operations (UK Status view of rig operations Rig list can be customizable for user preference Shows basic rig & well information Highlights rigs with NPT, and displays Total NPT Rig-1 Rig-2 Rig-3 Rig-4 Rig-5 Rig-6 7 Rig-8 Rig-9 Rig-10 Rig-11 Rig-12 Nov 30, 2018 · Hydraulic Rig Technology and Operations delivers the full spectrum of topics critical to running a hydraulic rig. 490 of this part), the lessee shall take appropriate precautions to protect life and property on the platform or rig, including but not limited to operations such as blowing the -Special-environment workover rigs - This workover rig is designed and manufactured in accordance with API Spec Q1, 4F, 7k, 8C and technical standards of RP500, GB3826. However, novel types of workover rigs such as grid-power, top-drive and automatic rigs still need further R&D efforts. In general is the running speed of a HWO unit lower than that of conventional workover rig. Workover operations mean the work conducted on wells after the initial well-completion operation for the purpose of maintaining or restoring the productivity of a well. Download scientific diagram | The main stages of workover processes from publication: Potential of using OEE in evaluating the operational performance of workover activities | Potential of using attend them as soon as possible. The Concentric Tubing Concept Basic Technique. Feb 1, 2023 · As a result, we can classify this problem as a workover rig scheduling problem (WRSP), which is a particular case of the rig scheduling problem for workover operations. Snubbing Unit The size of the rig equipment must be capable of handling the loads applied during casing running and/or drilling operations. Thus, the workover rig scheduling problem consists of finding the best schedule for the limited number of workover rigs, minimising the production loss associated with the wells waiting for maintenance service [3]. Workover Course Outline IADC WellCAP Oct 25, 2021 · Jack-up Rig Move Operations. Daily operations Reporting and Dashboards for ALL of Your Well Operations. It consists of an annular type blow out preventer and is designed to divert shallow gas away from the well area while drilling a surface hole. Feb 5, 2023 · Workover is a term used in the oil and gas industry to describe the maintenance and repair of existing wells. Blowout Preventer System 2. L. A workover rig. The document provides an overview of well services operations including well testing, completion, artificial lift, stimulation, and workover operations. Ÿ Describe the basic steps involved in the design of a routine work over procedure. In 2001, a North Slope operator evaluated the opportunity to utilize one rig to perform both operations. A typical rig-up would only include the following: Blind/Shear rams. May 11, 2018 · PDF | We present deterministic and stochastic programming models for the workover rig problem, one of the most challenging problems in the oil industry. Feb 1, 2020 · Workover operations are an important part of maintaining normal operation and stabilizing production of oil and gas, and the workover bit (We also call it drilling bit for workover or milling tool View ONGC-Workover Operations Onshore Manual. The string is then rotated to the left in an attempt to break a right-hand threaded connection in the fish. Apr 5, 2015 · Practical Evaluation Workover Framework (PEWF) for Evaluation and Process Improvement of Workover Rigs in the Oilfields Haitham Mansour *1, Munir Ahmad2, Fadala Ahtita 3 1School of Science and (297)SXJ650Z Workover Rig Operation and Maintenance Manual OK - Free ebook download as PDF File (. In any oil-field operation, however, the proper equipment must be selected for the intended purpose based on both safety and economics. aapg. It provides an introduction to workover, describing it as any work performed on a completed well to alter performance or structure. But there are a lot of problems yet to be solved, and the inventive technologist still can have his field day. Open Hole I operations. The offshore concentric tubing Mar 6, 2022 · Well completion is the activity carried after drilling a well to make it ready for production/Injection. With experience from thousands of wells, our drilling and evaluation experts use proprietary systems and advanced technology to execute remote drilling operations and deliver consistent results—everywhere. 5”. The advantages and disadvantages of early and modern types of drilling styles; Rig type classification and selection for onshore and offshore drilling; Types of platforms and techniques used for offshore rigs; The purpose and function of non‐vertical drilling, including directional and horizontal drilling Home Page | YUG-NEFTEGAZ PRIVATE LIMITED Aug 17, 2022 · The offshore drilling rig operations in this series one is a book that covers offshore subsea drilling and completions of good operations, the processes of drilling, the various types of drilling May 21, 2022 · The Diverter as one of the drilling rig components, is installed on the conductor pipe before drilling of the first phase of the well and is designed to keep personnel and Rig safe. The wellsite is now Workover/Well Servicing Operations Formerly WellCap Workover, this WellSharp® course is designed for individuals primarily responsible for workover operational processes of well control. Most of the time the decision A wealth of workover systems to extend the production life of any oil and gas well, from an oilfield services expert. Ÿ Illustrate the production wellhead. Generally, operators use one of five gases for drill pipe injection in UBD: (1) air, (2) membrane-generated nitrogen, (3) cryogenic nitrogen, (4) natural gas, and (5) exhaust gas. Civil engineering plays a key role in Mar 15, 2022 · Abstract. DIR DIR 5505/2 5505/2 Standard workover operations DIR DIR 5505/4 5505/4 – changing beam pumps, The aforementioned. itionType of workover operatio. Balancing between proactive and reactive workovers to optimize the rig schedule is a complex decision that requires a compelling objective function. Stand-alone, information-packed chapters of the 12th edition of the definitive rig operations manual, the new IADC Drilling Manual, are available in convenient electronic form. Compared with the Conventional units, the new Electrical hoists are equipped with the latest technology and ergonomics that ensure safe operations and faster movement between locations which reflects in the increased number of wells attended so far in 2022. Excellent for cross-training of other technical disciplines such as reservoir and facility engineers, geoscientists, supervisors, service personnel, and anyone who interacts with drilling, completion or workover engineers. Annular BOP. 8 WORKOVER RIG SELECTION DRILLING DEPARTMENT PETRONAS CARIGALI SDN BHD CM 23 COMPLETION MANUAL RIG WORKOVER OPERATIONS Page 40 of 45 Issue 1 PROPRIETARY INFORMATION -For Authorised Company Use Only January 1998 The final part of this When a well-workover operation is conducted in zones known to contain hydrogen sulfide (H 2 S) or in zones where the presence of H 2 S is unknown (as defined in § 250. 4. Petroleum Geology and Reservoirs, 3rd Ed. 2075 Corpus ID: 263325362; Evaluasi Workover Rig N55XC-M Untuk Program Penggantian Electric Submersible Pump (ESP) Pada Sumur AMR-15 @article{Sari2023EvaluasiWR, title={Evaluasi Workover Rig N55XC-M Untuk Program Penggantian Electric Submersible Pump (ESP) Pada Sumur AMR-15}, author={Riska Laksmita Sari and Pijar Fitrah Ababil}, journal={Teknika Sains: Jurnal Ilmu This document provides an overview of a PetroSkills training course on drilling operations, completion practices, and well intervention techniques. Brine) into the well whose weight is appropriate to control the formation pressure. See full list on wiki. Rotary Drilling 2. Through-tubing workover operations, using coiled tubing, snubbing or slickline equipment, are routinely conducted to complete treatments or well service activities that avoid A workover rig is a type of oil and gas drilling rig that is used to perform maintenance and repair work on existing wells, rather than drilling new ones. These tasks are performed using specialized equipment, such as workover rigs, and a team of skilled workers. It is made up of 35 inspection forms. When a well requires maintenance, its production is reduced or stopped for safety reasons and some workover rig must service it within a given Rig Check was developed by the National Institute for Occupational Safety and Health (NIOSH) in partnership with safety experts from the oil and gas extraction industry. txt) or read book online for free. Ÿ Analyze production wellhead and production string or tubing. pdf), Text File (. Through the expanded collection of operation-specific data, operators and May 11, 2018 · The results suggest that the proposed methodology can be used to solve large instances and produces quality solutions in computationally reasonable times. Dril of this subpart. v8i1. SPE 6687 -MS, presented at the Offshore Europe Conference, Septemb er 14-15, 1977. Alternative approaches to optimize Electrical Submersible Pump (ESP) replacements were evaluated and a Hydraulic Workover Unit (HWU) was selected as delivering the most advantageous outcome for the field to expedite the workovers efficiently and cost Oct 4, 2011 · In many cases, workover implies the removal and replacement of the production tubing string after the well has been killed and a workover rig has been placed on location. BOP Pipe rams. Workover Workover Workover operations Rigs Rigs. It is intended that the applicable requirements and recommendations of some sections of the This presentation provides information about workover operations in OIL. Hydraulic cylinders can generate large pull and push forces and give the HWO unit a small footprint and layout. List of articles in category Well Completion and Workover; Title; A Primer of Oilwell Service, Workover, and Completion Artificial Lift Methods, 2nd Ed. 613 Approval and reporting for well-workover operations. Rotary Drilling Process 2. 24967/teksis. CHAPTER-1 Workover Rig And Equipment 1. Also referred to as a snubbing unit, this single product covers all the specific specialties and knowledge needed to keep production going, from their history, to components and equipment. Through-tubing workover operations, using coiled tubing , snubbing or slickline equipment, are routinely conducted to complete treatments or well service activities that avoid Jun 10, 2012 · Workover operations in onshore Arabian fields were not exempt from the BOOM as the rig utilization history of Figure 1 demonstrates; the number of active rigs doubled between 1979 and 1982. This manual is intended to provide information for the guidance of the rig worker. Mar 29, 2023 · DOI: 10. SPECIAL WORKOVER RIG 3. The document provides information about workover operations and preparation of a drill site for an LM-150 rig. Mar 15, 2022 · Workover rig drillout operations can be some of the most costly and important activities in the life cycle of a well. Workover rigs also use a bit float as a standard piece of equipment. Well killing involves circulating a fluid (called workover fluid e. Control of Formation Pressure Fishing Tools and Techniques Introduction to Oilwell Service and Workover, 2nd Ed. dihdciwoqtvspthtmqzsfwibklvwwwbftmmdcndatlzygerhyd